|
|
|
Showing items
1
to
10
of
136
|
|
A SERIES/Owner-Contractor Documents (minimum order 5 copies each)
|
|
|
A101 - 2007 (formerly A101 - 1997) Standard Form of Agreement Between Owner and Contractor where the Basis of Payment is a Stipulated Sum
A101 - 2007 (formerly A101 - 1997) Standard Form of Agreement between Owner and Contractor-Stipulated Sum.......................................................$10.00
|
|
|
|
A101 /CMa - 1992 Standard Form of Agreement Between Owner and Contractor where the Basis of Payment is a Stipulated Sum, Construction Manager-Adviser Edition
A101 /CMa - 1992 Standard Form of Agreement Between Owner and Contractor where the Basis of Payment is a Stipulated Sum, Construction Manager-Adviser Edition.............................................. $10.00
|
|
|
|
A102 - 2007 (formerly A111 - 1997) Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee, with a Guaranteed Maximum Price
A102 - 2007 (formerly A111 - 1997) Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee, with a Guaranteed Maximum Price.......................................................$10.00
|
|
|
|
A103 - 2007 (formerly A114) Standard Form of Agreement between Owner and Contractor Where the Basis of Payment is the Cost of the Work Plus a Fee without GMP
A103 - 2007 (formerly A114) Standard Form of Agreement between Owner and Contractor Where the Basis of Payment is the Cost of the Work Plus a Fee without GMP .......................................................$10.00
|
|
|
|
A105 - 2007 (formerly A105 - 1993 and A205 - 1993) Standard form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project
A105 - 2007 (formerly A105 - 1993 and A205 - 1993) Standard form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project.........................................$8.00
|
|
|
|
A107 - 2007 (formerly A107 - 1997) Standard Form of Agreement Between Owner and Contactor for a Project of Limited Scope
A107 - 2007 (formerly A107 - 1997) Standard Form of Agreement Between Owner and Contactor for a Project of Limited Scope..............................$10.00
|
|
|
|
A114 - 2001 Standard Form of Agreement between Owner and Contractor Where the Basis of Payment is the Cost of the Work Plus a Fee without GMP
A114 - 2001 Standard Form of Agreement between Owner and Contractor Where the Basis of Payment is the Cost of the Work Plus a Fee without GMP.......................................................$10.00
|
|
|
|
A121/CMc - 2003 Standard Form of Agreement Between Owner and Construction Manager where the Construction Manager is also the Constructor
A121/CMc - 2003 Standard Form of Agreement Between Owner and Construction Manager where the Construction Manager is also the Constructor (AGC Document 565).......................................................$10.00
|
|
|
|
A131/CMc - 2003 Standard Form of Agreement between Owner and Construction Manager
A131/CMc - 2003 Standard Form of Agreement between Owner and Construction Manager where the Construction Manager is also the Constructor and where the Basis of Payment is the Cost Plus a Fee and there is no Guarantee of Cost (AGC Document 566).......................................................$10.00
|
|
|
|
A134™–2009 (formerly A131™CMc–2003), Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guarantee Maximum Price
Similar to A133–2009, this construction manager as constructor agreement is intended for use when the owner seeks a construction manager who will take on responsibility for providing the means and methods of construction. However, in AIA Document A134–2009 the construction manager does not provide a Guaranteed Maximum Price (GMP). A134–2009 employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds.
The agreement divides the construction manager’s services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A134–2009 is coordinated for use with AIA Documents A201™–2007, General Conditions of the Contract for Construction, and B103™–2007, Standard Form of Agreement Between Owner and Architect for a Large or Complex Project.
|
|
|
|